영문

스킵네비게이션

Total Environmental Analysis Center

Center Infrastructure

Facilities

  • Reception & Research Office(Administration)(Area : 112.5m²) Reception of Test materials
  • Physio-chemistry Lab. 1(Area : 112.5m²) Preparation for Soil Testing & General Physio-chemistry Test
  • Physio-chemistry Lab. 2(Area : 112.5m²) Preparation for Drinking Water Test & General Physio-chemistry Test
  • ICP/MS Lab.(Area : 37.5m²) Heavy metal contents test for drinking water
  • Instrument Analysis Lab. 1(Area : 37.5m²) VOC, 1.4-dioxane, DEHP, Benzopyrene test
  • Instrument Analysis Lab. 2(Area : 37.5m²) TPH, Organic Phosphorus, PCB, Phenol Test
  • Instrument Analysis Lab. 3(Area : 37.5m²) Heavy Metal Test
  • Instrument Analysis Lab. 4(Area : 37.5m²) Detergent, Cyan, Phenol and Ion Test
  • Instrument Analysis Lab. 5(Area : 37.5m²) NMR Analysis
  • Microbiology Lab.(Area : 100m²) General Bacteria, Bacillus Group Test

Equipment

Equipment for drinking water
  • P&T-GC-MS volatile organic compounds(VOC) micr(o)analysis
  • ICP-MS micr(o)analysis for metals
  • Autoanalyzer T-N, T-P, NH3-N & CN, Phenol, ABS Auto Measuring
  • IC Anion micr(o)analysis
  • HPLC Carbamate qualitative[quantitative] analysis
  • AA metallic species analysis for water and soil

Equipment for Soil
  • P&T-GC-MS Examination of the organic chemicals in aqueous solution and molecular weight Measurement
  • ICP qualitative[quantitative] analysis in the metallics
  • GC qualitative[quantitative] analysis for total petroleum hydrocarbons
  • GC qualitative[quantitative] analysis for Halogenated compound product and of organophosphorus compounds
  • Automatic Sample Preparation System microingredient test contained in inorganic substance of the soil
  • Accelerated Solvent Extraction Automated preconditioning equipment that enable organism in soil to be accelerated with high efficiency

Operation Outcome

Operation Outcome to provide information on Department, Area and Outcome
Area Outcome
Agency designated by Ministry of Environment Soil inspection
  • detailed investigation of soil
    • Nakdong-gang refurbishment project in Zone 22
    • 00 local branch of the Korea National Oil Corporation
    • Hyundai Oilbank Co. Retail Gas Station
    • Army's 7069 squadron and 45 sites
  • Soil Remediation Verification
    • Soil verification services of environmental pollution cleanup project for returned US army base(Zone 1-2)
    • Soil pollution level test for Army's 7069 squadron and 35 sites
    • Army's 7821 squadron
    • D Petroleum Co. and 120 companies
    • Hyundai Oilbank Co. and 750 gas stations
Drinking water inspection
  • Quarterly filtered and unfiltered water quality inspection for Office of Waterworks, Ulsan Metropolitan City
  • Water quality examination of water purifier for 54 elementary, middle and high schools within Ulsan Metropolitan City
  • Water examination 270 cases per year for Large building water supply installation (water tank and pipe)
  • Water examination 350 cases per year for underground water
Education On the Job Training
  • Field trip for related department (30-50 students per year)
  • 2 credits, 160 hours for 4 weeks course
  • Soil inspection, drinking water inspection, instrument inspection
Internship course
  • Field trip for related department (4 students)
  • 12 credits for 3 months course
  • Advance learning course for field trip
Intern course
  • Graduates from related department (3 students)
  • 3-6 months course